Phases, cost codes, cost types, and billing rules
Define how job costs are organized — phases, cost codes, cost types such as labor, material, subcontract, equipment — and the billing rules applied to each.
- Plans
- Advanced and above
- Availability
- Available
- For
- Accountants, Bookkeepers
- In KontoCore
Projects → Cost structure
What this does
A cost structure is a reusable list of phases and cost codes. Each cost line is tagged with a cost type (labor, material, subcontract, equipment, other).
Billing rules define how billable costs are marked up for time-and-materials or cost-plus billing.
How to
Set up
- 1Open Projects → Cost structure → New template.
- 2Add phases and cost codes; set default cost types.
- 3Add billing rules (markup per cost type) if you bill T&M.
- 4Apply the template to new jobs.
Corrections, voids, and reversals
- Inactivate unused codes instead of deleting; codes with history can’t be removed.
Permissions
- Administrators and accountants maintain templates.
What happens in your books
Codes are reporting dimensions; GL accounts still come from the source document.
Common mistakes
- Creating a new code for every job instead of a shared template, which breaks cross-job reporting.
Troubleshooting
Code missing on a bill
It’s inactive or not part of that job’s structure.
Related articles
Job budgets and revisionsBuild a job budget by cost code and type, approve it as the original budget, and track revisions and change orders without losing the original.Job costingAssign labor, materials, equipment, and other costs to projects and compare them with budgets and billing.Job billing, progress applications, and retainageBill jobs by progress against the schedule of values or by time-and-materials from billable costs, with retainage held per line and billed-to-date always derived.Job detail and closeoutUse a job’s detail page to see contract, budget, committed, actual, billed, and remaining amounts, and close the job out cleanly when work is done.